Tracing and installation of a polyester shell swimming pool

presentation

General
Once the contractual reference points have been established and based on the data in the pool’s technical data sheet, the following steps must be taken.


Planimetry
Planimetry (or implementation) is the verification of the following steps:
Plotting the ribs using stakes, ropes and/or tracer spray.
Check the diagonals and brackets.
Take into account alignments and/or parallels with existing volulmes (house, wall,…).

For free forms or other shapes, it is recommended to refer to the recommendations in the technical data sheet or to use a tracing template.

Altimetry
Once the location of your swimming pool is established, it is important to define its level in relation to a chosen point (terrace, house, …) or in relation to the slope of your land.


The Zero Point is therefore the marker corresponding to the finished level of the pool. It is necessary to define if it is the level with or without curbstone or with or without terrace. The reference point at the technical lip must be taken into account when drawing up the installation report. The reference point at the technical lip must be taken into account when drawing up the installation report. The possible thickness of the paving and the slope of the rainwater run-off must therefore be taken into account.


This reference point will be the reference point during the construction period. It must therefore be the object of particular attention and be at a chosen location outside the various discharge passages.

.